Refinery
POX-/Methanol
Modernization of three reactor units – each consisting of a reactor, sub-reactor, and waste heat exchanger
Study, FEED, Detail engineering for three lots, Construction supervision, Warehousing
Flue Gas Desulphurization
Engineering and installation of a flue gas desulphurization plant for efficient reduction of sulphur dioxide emissions
Pre-Basic engineering, Detail engineering, Procurement, Construction supervision
Used Oil Re-Refining
HyLube plant for the production of API base oils Group III/III+ based on used oil
Detail engineering, Procurement, Construction supervision
Aromatics Extraction
Modification of the existing Arosolvan plant: replace-ment of N-methyl-2-pyrrolidone (NMP) by the less toxic solvent tetraethylene glycol (TTEG), minimization of energy and utilities consumption
Extended basic engineering, Detail engineering, Procurement, Construction supervision
Crude Oil
Revamp of existing crude oil distillation plant replacing two side stripper columns, pre-column and liquified gas column with two reboilers in compund shutdown „Step2“
Detail engineering, Participation in authority engineering, Procurement, Expediting, Construction supervision
Lube Oil Blending
Extension of the existing measuring, dosing and blending systems to improve plant flexibility and to double capacity
Delivery of equipment, Construction supervision, Commissioning support
Propane Deasphalting
Conversion of the PDA plant built in 2011 using a solvent mixture instead of propane
Basic engineering, Detail engineering, Authority engineering, Procurement, Construction supervision, Commissioning support
Coker
Optimization of the coker unit with replacement of two coke drums; weight per coke drum: 400 t, height per coke drum: 35 m
Detail engineering, Field engineering
Desulphurization
Installation of 2 HDS plants (Euro-5-Norm) on license basis of Shell and UOP, executed according to Russian national project conditions
Detail engineering,Procurement,Authorial supervision
Propane De-Asphalting
Revamp of a PDA plant with two new extraction columns (Ø 3,6 m, 107 t) in cooperation with
Sulzer Chemtech (internals) and Kremsmüller (columns)
Tests in EDL pilot plant, Basic engineering, Detail engineering, Supply of 2 extraction columns, Author control
Desulphurization
Replacement of the HDS-3 reactor in the plant for desulphurization and denitrification of vacuum gasoil; reactor: 465° C / 80 bar, hight: 25 m, weight: 382 t
FEED, Detail engineering, Construction supervision, Commissioning support
Crude Oil
Revamp of the crude-oil-distillation RD-4 for yield improvement and enhanced plant operation mode
FEED, Detail engineering, Procurement (2014), Construction supervision, Commissioning support
Destillation
Revamp of the DEA-1 and DEA-2 distillation plants to improve product yield and plant operation,
replacement of column and key equipment
FEED, Detail engineering, Procurement, Construction supervision, Commissioning support
Crude Oil
Revamp of the crude oil distillation unit (Rohöl1) with replacement of the vacuum
column and a stripper column, optimized prefabrication in modules
Basic engineering, Detail engineering, Procurement, Construction supervision
FCC
Replacement of the regenerator at the FCC unit; because of the heavy weight (648 t) it was
performed in three cases and was finalized together with the LCO recovery project at the
shut-down „kleiner 16“
Detail engineering, Procurement, Construction supervision
Desulphurization
Revamp of the medium-pressure desulfurization plant DK2 replacing the stripper column including foundation
Basic engineering, Detail engineering, Procurement, Construction supervision
FCC
Reconstruction of FCC gas processing plant to improve the yield structure
Detail engineering, Procurement, Construction supervision, Commissioning support
Alkylation
Revamp of alkylation plant for capacity expansion of alkylate increase
Detail engineering, Procurement, Construction supervision, Commissioning
FCC Gas Postprocessing
Reconstruction of FCC gas processing plant to improve the yield structure
Detail engineering, Procurement, Construction supervision, Commissioning
Crude Oil
Modernization of the crude oil distillation plant4 (RD4), distillation plant1 (DEA1), distillation plant2 (DEA2), new residue cooling system (RSK) to increase cooling capacity at residue line
Project management, Basic engineering, Detail engineering, Procurement, Construction supervision, Commissioning support
Butadiene
Capacity extensions to butadiene production unit
Project management, Basic engineering, Detail engineering, Procurement, Construction supervision, Commissioning support
Vacuum Plant
Replacement of the vacuum column of the vacuum plant based on the modern deep-cut process
Extended basic engineering, Detail engineering, Procurement, Construction supervision
Propane Deasphalting
The new PDA plant is to obtain deasphalted oil from vacuum residue by propane extraction
Basic engineering, Detail engineering, Procurement, Construction supervision, Commissioning support
Crude Oil
Modernization the crude oil distillation plant 4 (RD4) in Schwechat including the modernization of the lower circulation return lines of the distillation plant
Detail engineering, Procurement, Construction supervision, Commissioning
Crude Oil
Replacement of the main column for improvement of MD recovery and for production of a jet fuel component; use of a 1350 t crane during installation
Detail engineering, Procurement, Construction supervision, Commissioning support
FCC Gas Concentration
Revamp of the stripping column with further peripheral equipment to improve the propene recovery process
Basic engineering, Detail engineering, Procurement, Construction supervision, Commissioning
Desulphurization
Construction of the gasoil desulphurization plant „IGO ppm 50 S“
Detail engineering, Procurement, Construction supervision, Site management, Commissioning support
Desulphurization
Complete revamp of the desulfurization plant HDS-1 to reduce the sulfur production to less than 10 ppm and triple the capacity from 1000 TPD to 3500 TPD
Detail engineering, Procurement, Construction supervision, Commissioning support
FCC Overcracking
Construction of a C3 splitter (Ø 5,2 m, total height 84 m) to produce propylene with polymer grade quality
Basic engineering, Detail engineering, Procurement, Construction supervision, Commissioning support
Refinery Gas
Debottlenecking of refinery gas plant
Detail engineering, Procurement, Construction supervision, Site management, Commissioning support
Petrochemicals
Ethylene / Propylene
Expansion and modernization of the cracker plants and the refrigeration system to increase ethylene and propylene production by 50,000 TPA
Basic engineering, Detail engineering, Construction supervision, Commissioning support
ISO C4
Construction of a new ISO C4 plant for the direct production of high-purity isobutene from feedstock of the metathesis plant; world‘s first application of a newly developed technology from OMV and BASF; construction incl. storage tanks and tank car loading
Detail engineering, Procurement, Construction supervision, Commissioning support
Special Synthetic Rubber
Construction of a Solution-Styrene-Butadiene-Rubber (SSBR) pilot plant for the production of test samples of synthetic rubber for the tire industry
Basic engineering incl. cost estimate, Constribution to authority engineering, Detail engineering, Procurement, Construction supervision, Commissioning support
Butadiene
Revamp of a butadiene extraction plant to increase plant capacity
Basic engineering, Detail engineering, Procurement, Construction supervision, Commissioning
Polymeric Fibre Pilot Plant
Construction and expansion of a pilot plant for polymer fibre production for the production of ceramic composites
Project management, Detail engineering, Layout engineering, Procurement, Construction supervision, Tests, Commissioning
Chemicals
Methylcellulose
Expansion of the existing facilities to increase production capacity of methylcellulose in Bitterfeld and to increase blending and loading capacity in Bomlitz
Engineering, Procuremement support, As-built documentation
Epoxy Resin
New plant for the production of epoxy resins from bisphenol and epichlorohydrin as an extension of the existing resin plants LH1 to LH3
Basic engineering, Detail engineering, Procurement, Construction supervision
Bisphenol
Installation of a production plant of bisphenol TMC from phenol and acetone
Basic engineering, Detail engineering
Bisphenol
Installation of a plant for the production of bisphenol F
Basic engineering,Detail engineering,Procurement,Construction supervision
Epoxy Resin
Installation of a plant for the production of epoxy resins
Basic engineering,Detail engineering,Procurement,Construction supervision
Energy & Environment
Used Oil Re-Refining
HyLube3 plant for the production of API base oils of groups III/III+ based on used oil
Detail engineering, Procurement, Construction supervision
Power-to-Liquid
Study for the construction of a demonstration plant to produce 1,000 l/d of renewable
jet fuel from CO2 and water from ambient air as well as renewable power, Proof of
both technical and economic feasibility
Study with definition of the concept and basic engineering for onsite production of renewable jet fuel
Used Oil Re-Refining
Modification of the HyLube 2 plant to the production of base oil group III quality from used oil. The used oil treatment is carried out by stronger hydrocrack refining and extended catalytic treatment
Basic engineering, Detail engineering, Elaboration of inquiry and order documents, Technical site management
Used Oil Re-Refining
New construction of a used oil treatment plant (HyLube 2) based on the technology of UOP
Basic engineering, Detail engineering, Elaboration of inquiry and order documents, Technical site management
Synthetic Fuel
Production of 15,000 TPA of synthetic diesel fuel and 2.3 MW of electricity from 65,000 TPA of biomass (mainly wood), based on pyrolysis, gasification, synthesis gas purification and conditioning, Fischer-Tropsch synthesis, electricity and oxygen production
Support technology development, Basic Engineering, Detail Engineering, Procurement, Construction supervision, Commissioning support
Blast Furnace
General planning of central blower unit of blast furnace A (steam boiler, steam turbine, blast compressor, utility and gas piping, civil and steel structure and infrastructural equipment) and engineering of electrical, instrumentation and PLC for blast furnace A
General planning of central blower unit 2, Basic engineering, Procurement support, Construction supervision, Commissioning support